Approximation of the moisture content during service and erection time
Version
Published
Date Issued
2022-12-01
Author(s)
Type
Conference Paper
Language
English
Abstract
For quality planning of timber buildings, the estimation of the expected wood moisture content
especially during the construction process and in its use is still a challenge. The Eurocode 5,
EN 1995-1-1:2010 is providing three Service Classes (SC) and would just account SC1
according to the use of the structural members as indoor use. However, the effects of, for
example, moisture accumulation during the construction phase or the stresses that can be
caused by the commissioning of the building are not shown. Assignment of the correct SC to
a structure is one of the first important decisions a structural engineer needs to make when
starting the design of a timber structure. In the following, further approaches and models are
presented on how to calculate this impact in more detail.
especially during the construction process and in its use is still a challenge. The Eurocode 5,
EN 1995-1-1:2010 is providing three Service Classes (SC) and would just account SC1
according to the use of the structural members as indoor use. However, the effects of, for
example, moisture accumulation during the construction phase or the stresses that can be
caused by the commissioning of the building are not shown. Assignment of the correct SC to
a structure is one of the first important decisions a structural engineer needs to make when
starting the design of a timber structure. In the following, further approaches and models are
presented on how to calculate this impact in more detail.
Subjects
TG Bridge engineering
Conference
COST Action CA 20139, Holistic design of taller timber buildings (HELEN)
Submitter
FrankeS
Citation apa
Franke, B., Franke, S., & Schiere, M. (2022). Approximation of the moisture content during service and erection time. COST Action CA 20139, Holistic design of taller timber buildings (HELEN). https://doi.org/10.24451/arbor.20662
File(s)![Thumbnail Image]()
Loading...
restricted
Name
Franke Franke Schiere 2022 Approximation of MC during service and erection time.pdf
Size
565.87 KB
Format
Adobe PDF
Checksum (MD5)
0b5f514f99c4638944512ded55e5fa63
