Franke, Steffen; Gruetter, D. (2016). Development of a quality management plan for timber bridges In: TU1406. Belgrad, SRB. 30.03.-01.04.2016.
Text
D_12_Franke_S.pdf Restricted to registered users only Download (165kB) | Request a copy |
The Swiss State Secretariat for Education Research and Innovation SERI in conjunction with the European Cooperation in Science and Technology COST allows applying for research projects dealing with scientific problems in relation to a COST Action. Therefore a research project application was submitted within this framework. The background, content, objectives and relation to the COST Action TU 1406 will be given in this paper. The presentation of the project already during its application phase will ensure a direct link and most effective knowledge exchange for both, the project and the COST Action. The results will also directly be exchanged.
Item Type: |
Conference or Workshop Item (Paper) |
---|---|
Division/Institute: |
School of Architecture, Wood and Civil Engineering School of Architecture, Wood and Civil Engineering > Institute for Timber Construction, Structures and Architecture School of Architecture, Wood and Civil Engineering > Institute for Timber Construction IHB |
Name: |
Franke, Steffen0000-0003-2430-8491 and Gruetter, D. |
Subjects: |
T Technology > TG Bridge engineering |
Language: |
English |
Submitter: |
Steffen Franke |
Date Deposited: |
26 Feb 2020 12:41 |
Last Modified: |
18 Dec 2020 13:28 |
Related URLs: |
|
Uncontrolled Keywords: |
Timber Bridge Quality specification Quality plan Performance indicators NDT methods |
ARBOR DOI: |
10.24451/arbor.7307 |
URI: |
https://arbor.bfh.ch/id/eprint/7307 |