Proske, Dirk (2022). Überführbarkeit der Eingangsgrößen von Lebenszykluskostenanalysen bei Massivbrücken Beton- und Stahlbetonbau, 117(3), pp. 167-175. Wiley 10.1002/best.202200002
Text
Beton und Stahlbetonbau - 2022 - Proske - berf hrbarkeit der Eingangsgr en von Lebenszykluskostenanalysen bei Massivbr.pdf - Published Version Restricted to registered users only Available under License Publisher holds Copyright. Download (2MB) | Request a copy |
Life cycle cost analyses are a method for prioritizing structures and measures in the context of building maintenance management. Life cycle cost analyses take into account a large number of different input variables, which in turn are themselves based on different parameters, because often infrastructure and real estate operators do not have all input variables available. This paper deals with the transferability of the different input variables and parameters in order to be able to perform a homogeneous life cycle cost analysis. For this purpose, a literature review and a subjective estimation of cross-correlations were performed.
Item Type: |
Journal Article (Original Article) |
---|---|
Division/Institute: |
School of Architecture, Wood and Civil Engineering School of Architecture, Wood and Civil Engineering > AHB Teaching |
Name: |
Proske, Dirk |
Subjects: |
T Technology > TA Engineering (General). Civil engineering (General) |
ISSN: |
0005-9900 |
Publisher: |
Wiley |
Language: |
German |
Submitter: |
Dirk Proske |
Date Deposited: |
30 Mar 2022 11:04 |
Last Modified: |
30 Mar 2022 11:04 |
Publisher DOI: |
10.1002/best.202200002 |
ARBOR DOI: |
10.24451/arbor.16757 |
URI: |
https://arbor.bfh.ch/id/eprint/16757 |